CO₂ Electrolysis to Syngas

Capture and convert CO₂ in one step.

The urgency of carbon reduction

Earth's surface temperature is 1.1°C above pre-industrial levels, the highest in 100,000 years. The past decade (2011–2020) is the warmest on record.

Climate change is not just warming. Earth is an interconnected system; a shift anywhere triggers changes everywhere.

Our Technology

Electrochemical Carbon Capture & Utilization (eCCU)

CE's eCCU captures CO₂ from flue gas and converts it directly into syngas, formic acid, and value-added chemicals in a single step, powered by renewable electricity.

How CO₂ electrolysis produces syngas

CO₂ and H₂O are the feedstocks. Under an applied potential, CO₂ and H₂O are co-reduced at the cathode to produce syngas (CO + H₂), while water is oxidized at the anode to evolve O₂. Only CO₂ and H₂O are consumed; the electrolyte is not.

Wind
Syngas
Solar
Chemicals

Technical advantages

Syngas is a key feedstock for synthetic fuels, waxes, and chemicals via Fischer-Tropsch synthesis. Conventional routes rely on coal, oil, or natural gas.

CE uses only CO₂, H₂O, and renewable electricity: no thermal input, no intermediate steps. CO₂ is captured and converted to value-added chemicals in a single integrated process.

Key specifications

CO₂ throughput per stack
50–2000 t/year
Feed CO₂ concentration
10–100 %
Syngas purity
≥85 %
Syngas ratio
0.33:1–1:1 CO/H₂
Specific energy consumption
≤6.3 kWh/Nm³
Electrode service life
5–7 years

Core technology

CO₂ electrolysis process

Four integrated unit operations process low-concentration flue gas CO₂ directly: feed gas pretreatment and CO₂ enrichment, electrochemical reaction, electrolyte circulation, and product separation. The system requires no corrosive reagents and has low consumable costs.

CO₂ conversion catalyst and electrode

A bimetallic catalyst with high intrinsic CO₂ adsorption capacity. Selective for CO/H₂ production, tolerant to common flue-gas impurities, and regenerable, with a rated lifetime exceeding 8,000 h.

CO₂ electrolytic reactor

Zero-gap cell architecture: low ohmic resistance, compact footprint. A multi-channel, multiphase flow field ensures uniform reactant distribution and high catalyst utilization across the electrode area.

CO₂ Electrolysis: R&D Milestones

2015 2017

Synthesized CO₂ electroreduction catalysts; completed bench-scale performance trials.

Fabricated a 1 m² membrane electrode assembly (MEA).

Established a kg-to-ton-scale electrolyzer test platform.

Passed laboratory technical appraisal.

2018 2020

Designed a 50 t/year electrolyzer stack.

Optimized the first-generation pure-CO₂ electrolysis process.

Constructed and commissioned a 30–50 t/year pilot unit at a coal chemical facility.

2021 2023

Developed the second-generation integrated flue-gas CO₂ enrichment-and-electrolysis process.

Completed engineering design of a pressurized, thousand-ton CO₂-to-syngas reactor and process package.

Operated a thousand-ton-class atmospheric-pressure CO₂-to-syngas demonstration unit.

Validated the atmospheric-pressure CO₂ electrolysis process at industrial scale.

2024 2026

Commissioned 500 t/year CO₂-to-syngas demonstration unit at Yulin Power Plant.

Completed start-up and acceptance of Huadian's CO₂-to-methane project.

May 2026: Yulin unit passed 72-hour continuous on-site performance assessment.

CO₂ Electrolysis Syngas: Project Cases

Beijing Liulihe Jinyu Cement Project

Validated the second-generation integrated flue-gas CO₂ enrichment-and-electrolysis process using cement kiln off-gas as feed. Produced green syngas (CO/H₂ = 0.35–0.6) while displacing fossil-derived syngas consumption. The second-generation catalyst demonstrated high tolerance to typical flue-gas impurities.

5 t/year

Scale

3,000 h

Runtime

Cement kiln exhaust

Gas source

Inner Mongolia Yitai Hangjin CTL Plant

A 30–50 t/year CO₂-to-syngas demonstration unit at Yitai's coal-to-liquids plant completed a 72-hour continuous performance assessment organized by the China Petroleum and Chemical Industry Federation, making it the first electrochemical CO₂ conversion project to achieve full-process industrial verification in the coal chemical sector.

30–50 t/year

Scale

4,000 h

Runtime

Gasification tail gas

Gas source

Yulin Power Plant, 500 t/year

CE partnered with Yulin Energy Group in 2023. The 500 t/year CO₂-to-syngas unit was commissioned in 2024 and is rated for 764,000 Nm³ of syngas per year.

500 t CO₂/year

Scale

764,000 Nm³/year

Syngas output

Power plant flue-gas CO₂

Gas source

Talk to Our Experts

Get in touch to learn about our core technologies.